cycle paths

C08 Drainage

Publisher: 
Cycling England
Publication date: 
August 2008
Abstract: 

The need for adequate drainage should be considered during the design of all cycle tracks, especially at tie-ins, to prevent ponding or erosion during periods of heavy rain. Cycle-friendly gully grates should always be used and care taken to ensure that gullies are not located within the path of cyclists.

C03 Signs

Publisher: 
Cycling England
Publication date: 
August 2008
Abstract: 

The use of “CYCLISTS DISMOUNT” and “END OF ROUTE” signs should always be avoided unless there is a proven need.

The use of advance directions signs, particularly map-type where this will direct cyclists through complex junctions, can help cyclists conserve energy lost when stopping to read signs erected at junctions.

B03 Road Crossings Mid Link

Publisher: 
Cycling England
Publication date: 
August 2008
Abstract: 

Cycle tracks may be provided with priority crossings of roads where speeds are less than 30 mph, total traffic flows do not exceed 4,000 vehicles per day and the crossing is sited on a flat-topped road hump.

B07 Cycle Track Junctions

Publisher: 
Cycling England
Publication date: 
August 2008
Abstract: 

Adequate corner radii should be provided at junctions between cycle tracks (minimum 2m) and chamfered corners (min 1m) at the rear of footways crossed by cycle tracks, not 900 tie-ins. (see also A14 Corner Radii, B04 Junction and Forward Visibility, B05 Footway Crossings and B08 Access and Speed Controls).

Pages

Subscribe to RSS - cycle paths