Bad

A Cycle Lane Half as Wide as a Bike

Warrington Cycle Campaign’s Facility of the Month, July 2006

Infrastructure rating:

The Sustrans Safety Bollard

Warrington Cycle Campaign’s Facility of the Month, June 2006

Infrastructure rating:

The Other Door Zone

Warrington Cycle Campaign’s Facility of the Month, May 2006

Infrastructure rating:

Integrated Transport

Warrington Cycle Campaign’s Facility of the Month, April 2006\n\n

GEOMETRYCOLLECTION(POINT(52.387 -1.535))

Infrastructure rating:

In Case of Rain

Warrington Cycle Campaign’s Facility of the Month, March 2006

Infrastructure rating:

Not a Cycle Lane

Warrington Cycle Campaign’s Facility of the Month, February 2006

Infrastructure rating:

The End

Warrington Cycle Campaign’s Facility of the Month, January 2006

Infrastructure rating:

Small, but perfectly formed

Warrington Cycle Campaign’s Facility of the Month, December 2005\n\n

GEOMETRYCOLLECTION()

Infrastructure rating:

Cyclists Dismount

Warrington Cycle Campaign’s Facility of the Month, November 2005\n\n

GEOMETRYCOLLECTION(POINT(54.8949985205682 -2.96741113432027))

Infrastructure rating:

A Mandatory Cycle Lane

Warrington Cycle Campaign’s Facility of the Month, October 2005\n\n

GEOMETRYCOLLECTION(POINT(51.7679 -1.2585))

Infrastructure rating:

Pages

Subscribe to RSS - Bad