Bad

Secure Cycle Parking

Warrington Cycle Campaign’s Facility of the Month, March 2008\n\n

GEOMETRYCOLLECTION(POINT(50.7513 -1.8405))

Infrastructure rating:

Give Way to a Tree

Warrington Cycle Campaign’s Facility of the Month, February 2008

Note: Google Street View shows that the cycle lane markings have now been removed, but the segregated lane sign is still there, and you can see where the markings were.

Infrastructure rating:

Look Both Ways

Warrington Cycle Campaign’s Facility of the Month, January 2008

Infrastructure rating:

The Cornish Way

Warrington Cycle Campaign’s Facility of the Month, December 2007\n\n

GEOMETRYCOLLECTION(POINT(50.1200035021177 -5.53330849493703))

Infrastructure rating:

End of Route

Warrington Cycle Campaign’s Facility of the Month, November 2007\n\n

GEOMETRYCOLLECTION(POINT(52.195 1.01))

Infrastructure rating:

A French Facility

Warrington Cycle Campaign’s Facility of the Month, October 2007\n\n

GEOMETRYCOLLECTION(POINT(51.7832280650875 0.109381074423178))

Infrastructure rating:

Tackling Obesity in Harlow

Warrington Cycle Campaign’s Facility of the Month, September 2007\n\n

GEOMETRYCOLLECTION(POINT(51.7832280650875 0.109381074423178))

Infrastructure rating:

Some Decorative Bollards

Warrington Cycle Campaign’s Facility of the Month, August 2007

Infrastructure rating:

End of Route

Warrington Cycle Campaign’s Facility of the Month, July 2007\n\n

GEOMETRYCOLLECTION()

Infrastructure rating:

Take a Break

Warrington Cycle Campaign’s Facility of the Month, June 2007

Infrastructure rating:

Pages

Subscribe to RSS - Bad