Bad

Give Way

Warrington Cycle Campaign’s Facility of the Month, September 2010\n\n

GEOMETRYCOLLECTION(POINT(-8.979135 53.282689))

Infrastructure rating:

Tactile Paving

Warrington Cycle Campaign’s Facility of the Month, August 2010

Infrastructure rating:

Clear Segregation

Warrington Cycle Campaign’s Facility of the Month, July 2010\n\n

GEOMETRYCOLLECTION(POINT(-0.053289 51.673275))

Infrastructure rating:

A Strategically Placed Bollard

Warrington Cycle Campaign’s Facility of the Month, June 2010\n\n

GEOMETRYCOLLECTION()

Infrastructure rating:

Fietsers Afstappen

Warrington Cycle Campaign’s Facility of the Month, May 2010\n\n

GEOMETRYCOLLECTION(POINT(1.256889 51.938468))

Infrastructure rating:

Cycling in the Dutch Door Zone

Warrington Cycle Campaign’s Facility of the Month, April 2010\n\n

GEOMETRYCOLLECTION(POINT(5.124097 52.095153))

Infrastructure rating:

Direct, Comfortable and above all, Convenient

Warrington Cycle Campaign’s Facility of the Month, March 2010\n\n

GEOMETRYCOLLECTION(POINT(4.429185 50.812377))

Infrastructure rating:

Warrington's Answer to the Door-Zone Problem

Warrington Cycle Campaign’s Facility of the Month, February 2010\n\n

GEOMETRYCOLLECTION()

Infrastructure rating:

A facility for freeriders

Warrington Cycle Campaign’s Facility of the Month, January 2010\n\n

GEOMETRYCOLLECTION()

Infrastructure rating:

All Roads Lead to ...

Warrington Cycle Campaign’s Facility of the Month, December 2009

Infrastructure rating:

Pages

Subscribe to RSS - Bad